Prestolite Office Revamps Lighting with Inventronics’ Advanced HubSense Technology

Office lighting – Greenford, UK

Details:
Location: Greenford, UK
Year: 2024

In December 2023, Prestolite embarked on a transformative lighting upgrade at their Greenford, UK office. Faced with escalating energy costs, frequent failures of their existing T8 luminaires, and the upcoming ban on fluorescent lamps, Prestolite needed a future-proof solution. Inventronics, in collaboration with Prime Light, offered an innovative and efficient lighting system tailored to meet their specific needs.

Cutting-Edge Technology for Modern Offices
Prestolite’s decision to transition to energy-efficient LED panels was a critical move. However, they didn’t stop at just upgrading the luminaires. They aimed to harness smart control systems to further enhance energy savings and operational efficiency. The solution provided by Prime Light featured Inventronics’ HubSense drivers and sensors.

The components were strategically integrated to serve various office areas, including catering and dining spaces, ensuring a holistic upgrade.

Seamless Installation and Quick Commissioning
One of the standout features of this project was the remarkably swift installation and commissioning process. The entire installation across five floors, involving around 300 LED luminaires, was completed in just five days. Thanks to the wireless capabilities of the HubSense drivers and remote mains-powered Bluetooth PIRs, the system was up and running with minimal disruption to Prestolite’s operations. The commissioning phase, a potential bottleneck in many projects, was executed flawlessly within a single morning.

Impressive Results and Significant Savings
The Prestolite office lighting project in Greenford stands as a testament to the power of modern, smart lighting solutions. By choosing Inventronics’ HubSense technology, Prestolite not only enhanced their lighting quality but also achieved substantial energy and cost savings. This project highlights the importance of integrating advanced technology in building infrastructure to meet contemporary business needs effectively.

Key Outcomes:

  • 40% Energy Savings: Achieved through smart controls like daylight sensing, presence detection.
  • Minimal Disruption: Installation and commissioning completed in five days.
  • Enhanced Control: User-friendly system allowing easy adjustments and monitoring by in-house staff.
Project partners
Prime Light Groupcustomer
Prestoliteend customer
Products used